The 415 Ray C Hunt Drive – Third Floor Fit‐Out will
provide two new Patient Care Centers, Spine and Hand,
which will provide multidisciplinary services in a single
location. The project consists of the fit out of
approximately 21,000 gsf on the third floor of an existing three story
clinical office building. The first two floors currently
provide various outpatient clinical services. The project will
pursue LEED CI certification.
The new Spine Center will bring practioners from
Neurosurgery, Orthopedics, Neurology and Physical
Therapy together into one location. There will also be
pain management services provided within the Spine
Center. The new Hand Center will bring together practioners from
Orthopedics, Plastic Surgery, and Physical Therapy. The
remainder of the building will house a four x‐ray room
Radiology Suite, a conference room, and a staff lounge.
The project will utilize the existing utilities
infrastructure and provide improvements as required by
the selected equipment. The proposed finishes will match existing
finishes throughout the Health System with regards to
quality. All proposed finish selections will be approved
by the Health System finishes committee and meet or exceed LEED requirements.